This one is as hard a case study as OSHA publishes, and every plant with pressurized or heated process equipment should read it slowly.
On February 12 at a Janesville, Wisconsin food manufacturer — IPMF LLC, operating as NaturPak — the lid of an industrial kettle unexpectedly opened after a clogged vent line let pressure build. Steam, hot liquid, and product hit two employees. Both were hospitalized; one later died of complications.
Five weeks later, on March 18, it happened again. A kettle lid opened under pressure and burned three workers. Two of them died.
Three fatalities, two incidents, the same hazard, 34 days apart. OSHA's citations, announced in August, totaled $364,100 — and the detail that matters most is the word repeat: repeat citations for failing to develop, document, and use lockout/tagout procedures for the kettles, and for failing to train employees on them. Serious citations covered the kettle design's pressure and thermal hazards, no quick access to emergency water for burn response, fall exposure into the kettles, and never assessing PPE for thermal risk.
The first incident was the alarm. It went unanswered.
Forget OSHA for a second. On February 13, that company had everything it needed to know: a kettle had just proven it could pressurize unexpectedly and open its lid onto people. The window between incident one and incident two — five weeks — is where safety management actually lives. Lock out the line. Verify every vent path. Rewrite the procedure. Train everyone who touches a kettle. None of that happened fast enough, and two more people died in the same way the first one did.
LOTO is not an electrical program
In too many plants, lockout/tagout means breakers and disconnects. The standard — and physics — say otherwise: steam, pressure, hot liquid, gravity, springs, and chemical energy are all hazardous energy. A kettle with a clogged vent line is a stored-energy device. If your LOTO procedures don't isolate and verify every energy source on thermal process equipment — including making pressure visible and vent paths provable — you have an electrical program with a LOTO label on it. I ran a facility with industrial ammonia refrigeration; pressure and thermal energy were the lockouts we rehearsed hardest, because they're the ones that don't wait for you to touch anything.
Questions for your plant this week
- Which equipment in your building stores pressure or heat — and does each one have its own documented, used, rehearsed energy-control procedure?
- Could an operator prove, not assume, that a vent line is clear before opening anything?
- If someone is burned at your facility right now, how many seconds to flushing water — and has anyone timed the walk?
- Has your PPE hazard assessment ever specifically considered thermal exposure, or just impact and cut?
- And the big one: after your last near-miss or first injury on a piece of equipment, what actually changed before it ran again?
Details are from OSHA's enforcement announcement (U.S. Department of Labor, Aug. 20, 2026). The employer may contest the citations before the independent review commission. Our thoughts are with the families of the three workers.